News Flash Home
The original item was published from 1/13/2015 12:11:15 PM to 1/19/2015 12:05:00 AM.

News Flash

Brea Top Stories

Posted on: January 13, 2015

[ARCHIVED] Wildcat Way To Be Repaved on Saturday

On Saturday, January 17, Wildcat Way will be repaved. This busy public street section extends to the north from the intersection of Associated and Lambert Road and serves as the main entry point for Brea Olinda High School. A rubberized asphalt is being installed to maximize durability and road performance on this heavily used connector.

Work is scheduled to take place between 8:00 a.m. and 5:00 p.m. Vehicle access via Wildcat Way will be available at all times, except when the contractor is working in front of the school driveway where the motorist may have to wait several minutes. Individual lane closures will be intermittent and street parking during construction will not be available.

Motorists are advised to use caution and allow a few extra minutes if they are driving to the high school on Saturday.

Facebook Twitter Email

Other News in Brea Top Stories

Certificate of Achievement Award

Posted on: September 21, 2023

Orange County Housing Waitlist Opens

Posted on: September 12, 2023

Fall 2023 Brea Line Available Online

Posted on: July 21, 2023

Construction Project Status

Posted on: January 9, 2023